Blockout for Concrete Mould
CASE STUDY - Blockout For Concrete Mould (value $3,000)
SITUATION
Large Precast mould manufacturer SE Queensland
TASK
Blockout required for a mould that can be dismantled and reused. Current blockout is uneconomical and time consuming
ACTIONS
- Obtain customers initial requirements
- Come up with ideas and discuss with customer
- Manufacture for trials
- This project while small saved the customer a lot of hassle and time
- They still talk about this job and how successful it was
- The economical solution was found by doing some scribbles over a weekend and drawing it up on the Monday and fabricating. The solution once supplied to the customer was very simple
RESULT
- ✓ Project completed within budget for customer
- ✓ No lost time due to making Block-outs the standard way
- ✓ Minimal stress for the customer
- ✓ Good relationship between Hagan Machinery and Humes
- ✓ Warm feel for Hagan Machinery
- ✓ Others in the customers company made aware that HM can offer these services