CASE STUDY - Boiler Feedwater Tank Supply And Install (value $25,000)

SITUATION

Large abattoir SE Queensland

TASK

Manufacture and install Feed Water tank for Boiler

ACTIONS

  1. Obtain customers initial requirements
  2. Investigate materials to use and pro and cons of each. This was presented to the customer for a decision to be made on their preference. Stainless steel was selected
  3. Supply quotation
  4. This job took a twist when the customer sourced a ready-made tank in Brisbane and asked to price to install it. I went and had a look and quoted a price to install. This price was nearly twice the first quote.
  5. The customer some time later gave the order for the original quote.
  6. This job required specialist equipment (which we have) to roll the steam coils and plate sections.
  7. As per customers time line the old tank was removed and the new installed on a week end
  8. This job as with most at the abattoir require communicating and organisation between HM , customer supervisors, customer electricians and maintenance staff.

RESULT